top of page
Hyundai Motor Studio
Project Description:
Duration: Dec, 2012 ~ Dec. 2013
Location: Kyunggido, Republic of Korea
Design: Delugan Meissl Associate Architects (Austria)
Construction: Hyundai E & C
Size: 7 Story
Curtain Wall System: Unit
Scope of Services:
Design;
- 
Review of Façade system 
- 
Schematic Design 
- 
Review of Design Load 
- 
Review of Basic Budget 
- 
Value Engineering 
- 
Construction Documents 
Construction Administration;
- 
Value Engineering 
- 
Tender Review 
- 
Mock-up Review 
- 
Shop drawings Review 
- 
Factory Inspection report 
- 
Site Inspection 
- 
Final Report 
bottom of page



