top of page
Songdo CENTROAD
Project Description:
Duration: 2008 ~ 2009
Location: Incheon, R.O.K.
Design: Gansam/Heerim (ROK)
Construction: Posco E & C
Size: 33 Story
Scope of Services:
Design;
- 
Review of Façade system 
- 
Review of Design Load 
- 
Review of Basic Budget 
- 
Value Engineering 
- 
Construction Documents 
Construction Administration;
- 
Value Engineering 
- 
Tender Review 
- 
Mock-up Review 
- 
Shop drawings Review 
- 
Factory Inspection report 
- 
Site Inspection 
- 
Final Report 
bottom of page





