top of page
Canal Walk
Project Description:
Duration: Apirl 2008 ~ July 2009
Location: Incheon, R.O.K.
Design:
1. Foreign; GIK
2. Domestic; Dong IL (ROK)
Construction: TBD
Construction: Shinsegae Ltd.
Size: 5 Story
Curtain Wall System: Stick , p/w
Scope of Services:
Design;
- 
Review of Façade system 
- 
Schematic Design 
- 
Review of Design Load 
- 
Review of Basic Budget 
- 
Value Engineering 
- 
Construction Documents 
Construction Administration;
- 
Value Engineering 
- 
Tender Review 
- 
Mock-up Review 
- 
Shop drawings Review 
- 
Factory Inspection report 
- 
Site Inspection 
- 
Final Report 
bottom of page




